2010-2014SVT Raptor · V8.6210cc
Notes: excl. FX2 and Raptor Models
2011-2014FX2 · V8.4951cc
Notes: excl. FX2 and Raptor Models
2011-2014FX2 · V6.3496cc
Notes: excl. FX2 and Raptor Models
2011-2014FX4 · V8.4951cc
Notes: Install Time 1.5 Hours~ No Drilling Required Incl. Brackets; Air Helper Springs; Hardware; Air Line; And Inflation Valve
2011-2014FX4 · V6.3496cc
Notes: Install Time 1.5 Hours~ No Drilling Required Incl. Brackets; Air Helper Springs; Hardware; Air Line; And Inflation Valve
2011-2012Harley-Davidson Edition · V8.6210cc
Notes: Install Time 1.5 Hours~ No Drilling Required Incl. Brackets; Air Helper Springs; Hardware; Air Line; And Inflation Valve
2011-2014King Ranch · V8.4951cc
Notes: Install Time 1.5 Hours~ No Drilling Required Incl. Brackets; Air Helper Springs; Hardware; Air Line; And Inflation Valve
2011-2014King Ranch · V6.3496cc
Notes: 2011: Install Time 1.5 Hours~ No Drilling Required Incl. Brackets; Air Helper Springs; Hardware; Air Line; And Inflation Valve · 2012: Requires 8 in. Of Clearance Between Frame And Tire~Install Time 1.5 Hours~No Drilling Required Incl. Brackets; Air Helpe · 2013: Requires 8 in. Of Clearance Between Frame And Tire~Install Time 1.5 Hours~No Drilling Required Incl. Brackets; Air Helpe · 2014: Requires 8 in. Of Clearance Between Frame And Tire~Install Time 1.5 Hours~No Drilling Required Incl. Brackets; Air Helpe
2011-2014Lariat · V6.3496cc
Notes: 2011: Install Time 1.5 Hours~ No Drilling Required Incl. Brackets; Air Helper Springs; Hardware; Air Line; And Inflation Valve · 2012: Requires 8 in. Of Clearance Between Frame And Tire~Install Time 1.5 Hours~No Drilling Required Incl. Brackets; Air Helpe · 2013: Requires 8 in. Of Clearance Between Frame And Tire~Install Time 1.5 Hours~No Drilling Required Incl. Brackets; Air Helpe · 2014: Requires 8 in. Of Clearance Between Frame And Tire~Install Time 1.5 Hours~No Drilling Required Incl. Brackets; Air Helpe
2011-2014Lariat · V8.6210cc
Notes: Requires 8 in. Of Clearance Between Frame And Tire~Install Time 1.5 Hours~No Drilling Required Incl. Brackets; Air Helpe
2011-2014Lariat · V8.4951cc
Notes: Install Time 1.5 Hours~ No Drilling Required Incl. Brackets; Air Helper Springs; Hardware; Air Line; And Inflation Valve
2011Lariat Limited · V8.6210cc
Notes: Install Time 1.5 Hours~ No Drilling Required Incl. Brackets; Air Helper Springs; Hardware; Air Line; And Inflation Valve
2011-2014Platinum · V8.4951cc
Notes: Install Time 1.5 Hours~ No Drilling Required Incl. Brackets; Air Helper Springs; Hardware; Air Line; And Inflation Valve
2011-2014Platinum · V8.6210cc
Notes: Requires 8 in. Of Clearance Between Frame And Tire~Install Time 1.5 Hours~No Drilling Required Incl. Brackets; Air Helpe
2011-2014Platinum · V6.3496cc
Notes: Install Time 1.5 Hours~ No Drilling Required Incl. Brackets; Air Helper Springs; Hardware; Air Line; And Inflation Valve
2011-2014STX · V8.4951cc
Notes: Install Time 1.5 Hours~ No Drilling Required Incl. Brackets; Air Helper Springs; Hardware; Air Line; And Inflation Valve
2011-2014STX · V6.3726cc
Notes: Install Time 1.5 Hours~ No Drilling Required Incl. Brackets; Air Helper Springs; Hardware; Air Line; And Inflation Valve
2011-2014XL · V6.3726cc
Notes: 2011: Requires 8 in. Of Clearance Between Frame And Tire~ Do Not Exceed The Models Recommended Gross Vehicle Weight Rating (GV · 2012: Requires 8 in. Of Clearance Between Frame And Tire~ Do Not Exceed The Models Recommended Gross Vehicle Weight Rating (GV · 2013: Requires 8 in. Of Clearance Between Frame And Tire~ Do Not Exceed The Models Recommended Gross Vehicle Weight Rating (GV · 2014: Requires 8 in. Of Clearance Between Frame And Tire~Install Time 1.5 Hours~No Drilling Required Incl. Brackets; Air Helpe
2011-2014XL · V8.4951cc
Notes: Install Time 1.5 Hours~ No Drilling Required Incl. Brackets; Air Helper Springs; Hardware; Air Line; And Inflation Valve
2011-2014XL · V6.3496cc
Notes: Install Time 1.5 Hours~ No Drilling Required Incl. Brackets; Air Helper Springs; Hardware; Air Line; And Inflation Valve
2011-2014XLT · V6.3496cc
Notes: Requires 8 in. Of Clearance Between Frame And Tire~Install Time 1.5 Hours~No Drilling Required Incl. Brackets; Air Helpe
2011-2014XLT · V6.3726cc
Notes: Install Time 1.5 Hours~ No Drilling Required Incl. Brackets; Air Helper Springs; Hardware; Air Line; And Inflation Valve
2011-2014XLT · V8.4951cc
Notes: Install Time 1.5 Hours~ No Drilling Required Incl. Brackets; Air Helper Springs; Hardware; Air Line; And Inflation Valve
2013-2014FX2 · V8.6210cc
Notes: excl. FX2 and Raptor Models
2013-2014FX4 · V8.6210cc
Notes: Requires 8 in. Of Clearance Between Frame And Tire~Install Time 1.5 Hours~No Drilling Required Incl. Brackets; Air Helpe
2013-2014Limited · V6.3496cc
Notes: Requires 8 in. Of Clearance Between Frame And Tire~Install Time 1.5 Hours~No Drilling Required Incl. Brackets; Air Helpe
2013-2014XLT · V8.6210cc
Notes: Requires 8 in. Of Clearance Between Frame And Tire~Install Time 1.5 Hours~No Drilling Required Incl. Brackets; Air Helpe